Concrete for Footings, Foundation Walls and Basement Floors

How the mix changes from the footing to the wall to the floor, and what to plan for on pour day.

A foundation is usually three pours with three different jobs to do. The mix is not the same for each, so tell the dispatcher which one you are ordering.

The mix, pour by pour

Foundations and flatwork are normally placed at a 4 to 5 inch slump. If you need the concrete to flow more easily, ask for a water reducer when you order.

Reinforcing steel and cold weather

If the pour contains rebar and you want a faster set in cold weather, ask for a non-chloride accelerator. Calcium chloride must not be used with reinforcing steel.

Getting it into the forms

Walls and basement floors are often out of reach of the truck’s chute. Our sister company Central Illinois Conveying runs boom pumps, line pumps and belt conveyors. See pumping and conveying, or ask the dispatcher to set it up when you order. Foundations are normally poured with our standard 3/4 inch stone. A mix with 3/8 inch pea gravel or limestone chips is available on request.

What to tell dispatch

See Ordering & Delivery for unloading time and delivery terms, and Hot and cold weather concrete for winter pours.

Questions? Call dispatch.

A dispatcher can answer anything on this page for your job and your pour date.

Call dispatch · (815) 942-4344

Open Monday to Friday, 6 a.m. to 5 p.m. (4 p.m. in winter); Saturday by arrangement.